Please be advised that there will be a power interruption.
Affected Feeders:
PEREZ DRIVE MARCOS DRIVE RAMOS DRIVE BERNARDO DRIVE MORNING GLORY NUรEZ | GOV. ALVAREZ BALIWASAN DEDICATED SAN JOSE ARENA BLANCO NORTHSIDE | PRESA MERCEDES GUIWAN TETUAN TUMAGA ZAMPEN 13.2KV |
REASON
Replacement of existing 3-phase oil type to vacuum type circuit recloser of Baliwasan Feeder, replacement of defective 3-phase line recloser along Baliwasan crossing under San Jose Feeder, and to facilitate the relocation of existing three phase primary backbone line obstruction to the on-going DPWH project at Johnstone bridge affecting Baliwasan and Dedicated Feeder.
REASON
Replacement of existing 3-phase oil type to vacuum type circuit recloser of San Jose Feeder, replacement of defective 3-phase line recloser along Baliwasan crossing under San Jose Feeder, and to facilitate the relocation of existing three phase primary backbone line obstruction to the on-going DPWH project at Johnstone bridge affecting Baliwasan and Dedicated Feeder.
Please bear with us. The restoration of power will resume immediately after the completion of scheduled work, which, depending on the circumstances, may not be in accordance with the time specified.